What Is Included in a Complete Kitchen Renovation in Dubai? Full Scope & Process Guide



A full kitchen renovation in Dubai project can include many aspects of your kitchen. From layout design to demolition, plumbing, electrics, ventilation, flooring, cabinetry, appliance fitting and more.

It is important to note that not all contractors will do this. Knowing what is included in a full renovation will help villa and apartment owners avoid unexpected costs, delays and disputes. This guide outlines what is usually included in a full kitchen renovation, how it is carried out, optional upgrades and what to look out for.

What is included in a full kitchen renovation?

However, the exact services depend on your kitchen’s condition, layout changes, selected materials, and written contract.

Renovation stageTypical work involved
PlanningSite inspection, measurements, layout, material selection
DemolitionRemoving old cabinets, countertops, tiles, and fixtures
PlumbingSink connections, drainage, water supply, dishwasher connections
ElectricalAppliance connections, lighting, switches, sockets
VentilationCooker hood and extraction arrangements
Surface preparationWall repairs, plastering, floor levelling
CabinetryBase cabinets, wall units, storage, hardware
CountertopsMeasurement, fabrication, installation
FinishingBacksplash, flooring, painting, sealing
HandoverFunctional checks, cleaning, final walkthrough

Please note: A full renovation refers to what can be coordinated by a contractor, not necessarily everything listed above.

Kitchen Cosmetic Upgrade or Full Renovation?

Decide whether you want a cosmetic upgrade or full renovation. A cosmetic upgrade would include upgrading the finishes of your kitchen. Such as new cabinet doors, new countertops, repainting walls and updating lighting. A full renovation will include new cabinets, repositioned appliances, plumbing, electrics, flooring and ventilation.


If you have a functional layout, such as in an apartment, you may only require new finishes. If you have a villa and wish to change the position of your sink, add an island and extra appliances you’re likely to need a more technical renovation.

Step 1: Kitchen Site Inspection and Layout Planning

A full renovation project should start with understanding the current situation. The contractor will take measurements of your walls, ceiling height, doors, windows and cabinets. They will also identify plumbing, drainage, electrics and ventilation.


What should be included in your kitchen design? A functional design will include storage, cooking space, appliance sizes, easy navigation and good natural light.


Many layouts exist including:

  • U shape
  • L shape
  • Galley
  • Island

An island can be a lovely addition to a larger villa in Dubai however you need to ensure you have enough space to walk around, open appliances and easily use the drawers. When designing your kitchen you should also identify if any changes require building management or the relevant authorities. MAE Technical Services LLC have a range of kitchen renovations available in Dubai tailored to your property requirements.

Step 2: Removing the Existing Kitchen

Once your design and renovation has been decided upon your renovation can begin.Depending on your project, old cabinets, countertops, sinks, appliances, tiles and flooring can be removed. Ensure the contractor has isolated the correct electrics, water and gas. Also ensure any nearby flooring, doorways and furniture are protected.


What happens if hidden problems appear?  Sometimes when removing old cabinets there may be issues with leaking pipes, damaged plaster, loose electrics and poor wall finishes. This should be noted down and assessed. A good contractor will explain what the issue is, suggest what needs doing and whether it will incur extra charges.

Step 3: Plumbing and Electrical Work

You will need plumbing and electrics fitted to make your kitchen functional. Plumbing could involve new water connections, sink drainage, dishwasher connections and moving fixtures. Electrics could include extra sockets, correct appliance wiring, under-cabinet lighting and oven/hob connections.

Why does technical planning matter?  Having a beautiful cabinet layout can be useless if you can’t safely connect your oven and dishwasher. The contractor should check appliance details. Any changes to gas should be technically assessed and adhere to building and utility requirements. MAE Technical Services LLC also offer home renovations in Dubai.

Step 4: Kitchen Ventilation and Cooker Hood Installation

With ventilation being so important in Dubai, especially in open plan kitchens, you may want to upgrade your cooker hood. You may want to replace your cooker hood, have a look at your existing ducting or improve your ventilation if possible.


The US Environmental Protection Agency recommend using an external venting cooker hood to get rid of airborne particles and moisture caused by cooking. If you live in an apartment any changes to communal ventilation should be discussed with building management.

Step 5: Preparing Walls, Ceilings and Floors

Once all technical work has been completed your contractor will prepare your kitchen ready for your new finishes. This can include repairing plaster, levelling flooring, repairing damaged walls, tile prep and fixing any moisture damage.


If your contractor doesn’t prepare your surfaces you may run into issues. Uneven walls will cause issues with your cabinets and unprepared flooring can cause issues with your tiles. Fresh painting can be done on your walls in Dubai.


Step 6: Installing Kitchen Cabinets and Storage

Your cabinets will help determine how comfortable you are in your kitchen. A full cabinetry package can include base units, wall units, tall storage cupboards, drawers, doors, handles, hinges, kickboards and finish panels. Which cabinet materials should you consider?  Engineered board and plywood can be a great option for your cabinets if the manufacturer states they are suitable for kitchens.

For your doors laminate, acrylic and lacquer can offer different options. Homeowners in Dubai should pay particular attention to sealed edges on cabinets near your sink and dishwasher while doing home renovation. Functional options include pull-out pantry units, corner storage, soft close drawers and waste bins.

Step 7: Countertop Measurement and Installation

Countertops will generally need measuring once your base cabinets are firmly fitted. The fabricator will need to know about your sink cut-outs, hob cut-outs, edges, joinery and if support is required.


Popular countertop materials include:

  • Quartz
  • Granite
  • Porcelain
  • Marble
  • Solid surface

Quartz is easy to maintain, Granite can give a natural pattern and solid surface can hide joins. Marble can give a luxurious look however you need to take more care with acidic ingredients. Ensure your quote clearly states what type of countertop you are having, thickness, fabrication, delivery, installation and cut-outs.

Step 8: Flooring, Backsplash and Kitchen Finishes

Your kitchen will now be finished off. Porcelain tiles would be a good choice for many homes in Dubai due to their durability and water resistant properties. For your backsplash you can choose from ceramic tiles, porcelain and suitable glass panels.


Your contractor will also organise the grouting, tile edges, sealing, skirting and transitions between rooms. Small details are very important. Even if you have expensive cabinets, if your tiles aren’t finished properly you may be disappointed.

Step 9: Appliance Installation and Final Connections

Your appliances should fit your design. You may want to fit an oven, hob, fridge, dishwasher, microwave and/or cooker hood. Ensure you know the exact measurements of your model, what electrics are required, ventilation and water connections.


Ensure you know if your contractor will supply the appliances. Built in appliances need careful planning to ensure the cut-outs match the manufacturers specifications.

Step 10: Testing, Cleaning and Final Handover

Just because your cabinets look nice doesn’t mean your kitchen renovation is complete. Your contractor should check your cabinets have aligned doors, working drawers, no leaks on plumbing connections and working electrics.


Your appliances and ventilation should also be checked. On handover you can identify any finishing issues. Having a list of what needs fixing will help everyone agree.

Do I need permission for my kitchen renovation in Dubai?

Some kitchen renovations may require less requirements. If you are doing simple replacements then you may not need as much as if you are making structural changes, gas changes, communal changes or building changes. Rules can vary depending on your property, location, developer, building management and type of work.


The Dubai Development Authority have specific processes for fit-out permissions and building changes. Dubai Municipality also have processes for building permissions. Before beginning your renovation ensure you know what permissions you need.

How much does a full kitchen renovation cost in Dubai?


The total cost will depend on the size of your kitchen, the current condition, materials and technical requirements. A straightforward replacement that keeps the original layout will generally require less work than a renovation involving relocated plumbing, new electrical circuits, custom cabinetry, and premium appliances.

Renovation levelTypical scope
Budget-consciosCabinet door replacement, countertop upgrade, painting, limited fixture changes
Mid-rangeNew cabinets, worktops, backsplash, flooring, selected technical upgrades
PremiumCustom cabinetry, significant layout changes, specialist finishes, integrated appliances


These are scope categories, not fixed prices. A site inspection is necessary to assess actual requirements. For accurate planning, request a quotation that separates materials, labour, technical work, and optional upgrades.

How long does a full kitchen renovation take?

Kitchen renovations can take a few weeks. There is no real set time. A simple renovation with no changes to the layout can be completed quicker than a bespoke cabinetry project requiring permissions, specialist countertops and major plumbing and electrics changes.


The time will also depend on the availability of materials and what is found during demolition. Ask your contractor how long your project will take with key dates.


What should be included in your kitchen renovation quote?

Ensure you can easily identify what you are paying for.

Kitchen Renovation in Dubai



Before signing ensure the following is included:

  • Demolition & waste removal
  • Cabinet materials, finishes & hardware
  • Countertop details & installation
  • Plumbing, electrics & ventilation
  • Flooring, backsplash & painting
  • Appliance supply or fitting
  • Permissions required & who will coordinate
  • Estimated time & payments
  • What is not included, allowances & extra work
  • Final clean, testing & handover

A cheaper quote may not be the best option if they don’t include anything important.

Why choose MAE Technical Services LLC for your kitchen renovation?

MAE Technical Services LLC offer Complete Kitchen Renovation in Dubai and technical services for villas and apartments in Dubai. Whether you need new cabinets, countertops, tiling, painting, plumbing or electrics we can help you assess your space and plan your renovation.


We focus on a functional layout, suitable materials, quality workmanship and fair pricing based on what is required. Homeowners can discuss their requirements, have a site survey and receive a quote.


Frequently Asked Questions

1. What does a complete kitchen renovation include?

It can include design planning, demolition, plumbing, electrical work, ventilation, cabinetry, countertops, flooring, appliances, painting, and final checks. The exact inclusions depend on the contract.

2. Does kitchen renovation include plumbing and electrical work?

It can, particularly when appliances or fixtures move. However, contractors may quote technical modifications separately, so check the written scope.

3. Can I renovate my kitchen without changing the layout?

Yes. Keeping the existing layout can simplify the project and reduce the need for major plumbing and electrical alterations.

4. Are appliances included in kitchen renovation quotations?

Not always. Some quotations cover appliance installation but exclude purchasing the appliances themselves.

5. Can I use my kitchen during renovation?

Access is often limited during demolition, plumbing, electrical work, and installation. Arrange temporary food preparation facilities where possible.



Ready to Plan Your Complete Kitchen Renovation in Dubai?

A successful kitchen renovation starts with a clear scope, not simply a collection of attractive material samples. Knowing what needs replacing, which technical systems require attention, and what your contractor will actually deliver helps you make better decisions from the beginning.

Contact MAE Technical Services LLC to request a free kitchen renovation quote or book a site inspection in Dubai. Discuss your layout, materials, budget, and project requirements with the team before work begins.